On this street
Sash window painting on Lexham Gardens
Sashes on Lexham Gardens are not one pattern repeated. The appraisal records the features that give the conservation area its character: the windows are single glazed, made of timber, painted white, and fitted with horns added to strengthen the frame so it could carry large panes of glass. Within that, Wyand's terrace is two-over-two throughout, with tripartite ground-floor sashes divided by a single glazing bar, while Ashfold's five-storey houses have plain timber sashes with no glazing bars at all and an attic of arched windows above the third-floor cornice. This page is about repainting that joinery, and about saying which of those openings you actually have.
Sources: Royal Borough of Kensington and Chelsea, Lexham Gardens Conservation Area Appraisal; HSE, Construction hazardous substances: Lead; HSE, Old lead paint: what you need to know as a busy builder (CIS79); Historic England, Listed Building Consent (Historic England Advice Note 16)
The glazing patterns the council records along this street
Begin with the pane layout, because it decides how much edge there is to cut. On Wyand's nos. 90-108 (even) all the windows are two-over-two paned sashes; the ground-floor openings are the exception in form rather than pattern, being tripartite sashes with a single glazing bar dividing the central panes, set in vermiculated quoins under a keystone instead of in a bay. Nos. 89-99 (odd) also run two-over-two, with paired windows directly above. Ashfold's nos. 19-29 (odd) and nos. 20-34 (even) go the other way: plain timber sashes without glazing bars, and an attic storey of arched windows whose dormers the appraisal calls highly sensitive to change and features that must be conserved.
Those differences are not decoration for a brochure. A two-over-two sash has a meeting rail, a central bar and two sets of putty lines per sash; a plain sash has none of the bar work but a larger single pane whose putty line runs the full perimeter. An arched dormer head adds a curved rebate that only a brush will follow. The first thing a survey asks for is a photograph of one sash fully open, so the inner faces, the meeting rail and the sash box are visible rather than guessed.
White, horns and the parts that are not glass
The appraisal is specific that the sash windows contributing to the area's character are painted white, with horns strengthening the frame for large panes. A horn is a small projection of the stile past the meeting rail, and it is exactly the sort of detail a thick, repeatedly flooded coating rounds off. Keeping it crisp is a preparation decision rather than a product decision. The same applies to the parts of the opening that are not the sash: first-floor French windows on Wyand's terrace sit behind shallow balconies with cast iron railings in a criss-cross design, held within vermiculated stucco piers, so timber, metal and render meet within a hand's width.
Ironwork near the joinery follows its own rule here. Across the conservation area, railings were always painted one colour, without the tips picked out in a different colour, and small items such as footscrapers and pot guards on window sills are listed as important features in their own right. If a pot guard sits on your cill, it is prepared as metal and recorded as metal, not flooded with the same coating as the timber behind it. Where a four-panelled front door with nail head studs around the panels survives nearby, that door is a separate line too.
Preparation on painted timber that may hide lead
Sash repainting on a Victorian front is mostly preparation. The working order is to open and close the sashes to see how they run, wash down, then cut out failed putty and decayed timber locally rather than stripping an entire frame for the sake of a uniformly bare surface. Sound old film stays. HSE's guidance is that lead pigments were widely used in household paints until the 1960s, that sound old paint is best left in place, and that dry sanding of old paint is among the jobs that put people most at risk from lead dust. On a street of houses built between 1872 and 1884 that guidance is the default assumption, not an edge case.
So the method is low-dust and local: no blow lamp or gas torch on old film, no dry sanding of large painted areas, debris collected rather than left on the lightwell steps. Bare timber is primed once it is dry and stable. Beads and the meeting rail are brushed so the bar work keeps its line. Running gear, cords and fasteners are a joinery repair rather than decoration; where a sash is painted shut or a cord has gone, the quotation names it as a repair item instead of hiding it inside a decorating rate. Glass is masked or cut in cleanly, and putty that is renewed is given time before it is coated.
Sources: HSE, Construction hazardous substances: Lead; HSE, Old lead paint: what you need to know as a busy builder (CIS79)
Consent, uniformity and the terrace you share
These terraces were built as single structures, so a window colour is a shared matter in practice even when it is a private decision in law. The appraisal asks that the original examples from each group of houses are retained or reinstated where lost, and records that windows added to side elevations are mostly modern and not a historic feature that should be increased. A repaint cannot change a pattern, but it can stop drawing attention to the wrong things: a bar picked out in a second colour, a horn lost under build-up, a cill line that no longer matches the house next door.
On a listed building, Historic England's position is that like-for-like external redecoration matching type, texture, finish and colour usually needs no listed building consent, while a change of finish, or painting something currently bare, usually does. Ordinary repainting is otherwise maintenance under the Planning Portal's account, with Article 4 directions to be checked at the actual address. Bring any listing description, any freeholder or managing agent specification, and a note of the current colour and sheen on the joinery. If you want to move away from white, say so at the enquiry rather than at the sample stage, because that is a different conversation from a like-for-like recoat.
Sources: Historic England, Listed Building Consent (Historic England Advice Note 16); Planning Portal, External walls: planning permission
Access, scope and what changes the quotation
Height and position do most of the work in a sash quotation. A five-storey front over a half-basement puts third-floor and attic openings well beyond ladder work, and arched dormers above a third-floor cornice are reached from the roof edge or from a scaffold rather than leaned at. Lightwells, railings planted in a coping, front steps and projecting porches limit where a tower base can sit. Internal access matters too, because the inner faces and the sash box are reached from the room, which means protecting floors and shutters and agreeing which rooms are out of use on which day.
There is no price here. What moves the figure is the number of openings, the pane pattern, the condition of putty and cills, whether sashes currently run, and how the window is reached. A plain sash is quicker to coat than a two-over-two of the same size, and both are quicker than an arched dormer with a curved rebate. Repairs to decayed timber, failed putty or broken cords are quoted as repairs. Lead-safe working changes the method and the protection rather than the finish. Ask for the quotation to say how many openings are included, which faces are included, what is excluded, and which repairs are named as outside the decorating scope until agreed.
The Lexham Gardens street guide, from Wyand's terrace to Ashfold's arched attics
Sash window painting as a Kensington service, with the usual order of work
Sash window painting on Marloes Road, where the ornament runs in a hierarchy
Stucco painting on Lexham Gardens, if the render is in the same brief
Joinery painting on Kensington Court Place, with eight-over-two sashes and shopfronts
How timber sash windows are repainted in Kensington, with lead-safe preparation
Ask for a survey of your own sashes and an itemised quotation
Questions about Sash window painting on Lexham Gardens
What colour are sash windows on Lexham Gardens?
The appraisal records that the sash windows contributing to the character of the conservation area are single glazed, made of timber, painted white, and fitted with horns added to strengthen the frame so it could support large panes of glass. That is a description of what is there rather than a consent for your address, so the existing colour and sheen on your own joinery is recorded at the survey before anything is agreed.
Do all the houses have two-over-two sashes?
No. Wyand's nos. 90-108 (even) are two-over-two throughout, with tripartite ground-floor sashes divided by a single glazing bar. Ashfold's nos. 19-29 (odd) and nos. 20-34 (even) have plain timber sashes without glazing bars, with an attic storey of arched windows above the third-floor cornice. Nos. 89-99 (odd) are two-over-two with paired windows above. The pattern follows the builder, not the street.
Will old paint be stripped back to bare timber?
Not as a matter of course. HSE records that lead pigments were widely used in household paints until the 1960s, that sound old paint is best left in place, and that dry sanding old paint is among the jobs putting people most at risk from lead dust. On houses of this date the method is local, low-dust preparation: failed film and decayed timber are cut out, sound film stays, and no blow lamp or torch is used.
Adjoining streets and wider work
Where a sash needs joinery repair as well as paint, that wider work sits with Hampstead Renovations.
Start with a conversation
Tell us about your property.
Share the address, the rooms or surfaces, and what you have in mind.
Your project details
Tell us what you would like to decorate and where.