The decorating notebook
What affects the cost of painting and decorating in Kensington
A quotation for decorating in Kensington moves with the building in front of us. This page names those drivers and does not publish a price.
Sources: Historic England, Listed Building Consent (Historic England Advice Note 16); Planning Portal, External walls: planning permission; HSE, Construction hazardous substances: Lead; HSE, Old lead paint: what you need to know as a busy builder (CIS79); HSE Asbestos essentials a28, Removing textured coating from a small area; Approved Document B (Fire safety) Volume 1: Dwellings; Royal Borough of Kensington and Chelsea, Kensington Conservation Area Appraisal; Royal Borough of Kensington and Chelsea, Kensington Square Conservation Area Appraisal
We quote from the building, not from a tariff
This page explains what moves a quotation. It does not contain a price, a rate, a range, a percentage or a promised duration. After a site visit you receive a written itemised quotation. Decoration, repairs, access and anything still unknown are separate lines, so a total is not being asked to hide them.
The visit is the point. Two houses on the same street can differ in the way the appraisals already show: one fair-faced brick front and one stucco front on Kensington Square, one Flemish-bond house and one shop on Holland Street, one polished shopfront and one plain sash at Abbots Court. A tariff that ignored that would be fiction. We will not publish one.
Access, scaffolds and the pavement
Height and the way to the surface are often the largest practical difference. A Campden Hill Square house of several storeys, with a lower ground floor and a planted set-back, is not reached like a two-storey Hillgate terrace. Attic storeys that Stafford Terrace still has add the top of the outline. A mews such as Phillimore Walk, or a back lane such as South End, may have no sensible place for a large vehicle.
Where a scaffold has to stand on the highway, the council's permission for that structure is an access item. It is not the same thing as planning permission to paint. The access guide on this site explains bay suspensions as a separate council process from ordinary parking, and it tells you to read the sign on the bay. Those steps take organisation. They are listed in the quotation when they apply. They are not guessed from the postcode, and this page will not invent a fee.
Inside, the route matters as much as the street. A mansion flat means a stair or a lift, a managing agent's rules, and protection of common parts. A house with one door means that door cannot be wet all day. Materials have to stand somewhere that is not the only way to a bathroom.
Consent and listing
Ordinary repainting of a house is treated by the Planning Portal as maintenance that does not need planning permission. Listed buildings and Article 4 directions are the exceptions to check at the address. Significant works to a listed building need consent inside as well as outside. Historic England's narrower point on redecoration is that matching the existing type, texture, finish and colour usually needs no listed building consent, while painting a bare surface is likely to need it, and a change of sheen or a move from limewash to paint usually needs it.
Those checks can hold a colour decision. They do not, by themselves, hold a like-for-like recoat of a sound painted door. The quotation should say which is which. Research into historic colour, which the Kensington Square appraisal says comes only from deeds, records or analysis, is a cost if you commission it. It is not bundled into a tin.
South End is the cautionary local case. Paint on stock brick, including the striped scheme that enforcement then covered, is described as severely harmful. A cheap-looking "whole front" can become an expensive unpicking. Leaving the brick out of the scope is the economical reading of that document as well as the accurate one.
Condition, lead and asbestos
Sound surfaces are quicker than failed ones. Hollow stucco, open cracks in a channel, rotten cills, failed putty, and iron that has been buried under many coats all add repair lines. The repair is not a coat of paint with a hopeful name. If we cannot see the failure until paint is off, the quotation should say that the scope will be revised, rather than pretending the first look was complete.
Lead is a method cost. Pigments were widely used until the 1960s. Sound old paint is left. It is not burnt off and not dry-sanded as routine, because dry sanding old paint is a high-risk way of making lead dust. That care takes time and protection. It is not optional on period joinery.
Textured coatings on older ceilings and walls can contain asbestos. They are not sanded or scraped through. A ceiling that looks like a simple repaint may be a ceiling that must be left alone or handled under the proper rules. That changes the scope. It should change it in writing.
What an itemised quotation is for
The point of itemising is that you can see which driver applies to your house. A line for access is not a line for paint. A line for making good hollow stucco is not a line for colour. A line that says bare brick is excluded is as important as a line that says the sashes are included. If something is unknown, it is named as unknown, to be reviewed if it appears, rather than absorbed into a single preparation sum that cannot be explained later.
You do not need trade language to ask for that. Photographs, a list of rooms or of elevations, and a note of who else must agree, such as a managing agent or a freeholder, are enough to start. We visit, we look at the surfaces the photographs cannot settle, and we write the quotation from that. Comparing two such quotations is possible. Comparing two round totals with no contents is not, and this site will not help you do the second thing by publishing a typical figure.
If a driver does not apply, it should be absent. A ground-floor shopfront on Thackeray Street does not need a scaffold story invented for a turret flat. A like-for-like door on an unlisted house does not need a consent fee invented for a listed stucco front. The fair way to quote is to leave out what is not there.
Detail, occupation and shared buildings
A plain wall is less work than the same area broken into console hoods, canted bays, six-over-six bars, fanlights, carved stallrisers or spear finials. The appraisals spend their time on those details because the details are the architecture. They are also where the labour sits. A quotation that prices only "walls and woodwork" without naming them will not survive contact with a Phillimore cornice or a Thackeray Street shopfront.
Occupied houses cost organisation. Rooms stay in use, furniture stays in the flat, and drying has to respect the product and the household. Communal halls and stairs in a block add the manager's rules and, where linings are being changed, the fire performance that Approved Document B sets for circulation spaces in blocks of flats. We do not treat a private sitting room and a common stair as the same coating decision.
None of this produces a number on a web page. It produces a visit and then an itemised quotation you can compare with the building in front of you. If you want the local reasons a particular street is detailed, read the place page. If you want the sequence for stucco, sashes or railings, read those guides. Then write, with photographs.
Request a site visit and a written quotation
Access, parking and deliveries
Listed-building consent and painting
Start with a conversation
Tell us about your property.
Share the address, the rooms or surfaces, and what you have in mind.
Your project details
Tell us what you would like to decorate and where.